• Bâtiment d'atelier à structure métallique préfabriquée
  • video

Bâtiment d'atelier à structure métallique préfabriquée

  • Zhongda
  • Shenyang, Chine
  • 30 à 65 jours (selon les dessins spécifiques)
  • 50 000 tonnes/an
Fabricant d'ateliers de structures métalliques | Certifié AISC et fort de 20 ans d'expertise mondiale | Zhongda. Évoluant sous la direction d'un ingénieur structure en chef, nous proposons des services complets pour la construction d'ateliers métalliques conformes aux normes ASTM/Eurocode. Découvrez plus de 500 projets réalisés à travers le monde et obtenez un devis en toute transparence. Obtenez gratuitement les conseils d'un ingénieur en structure.

Standards for high-quality steel structure suppliers:

  • ISO 9001 Certified

  • AWS D1.1 Welding Standard

  • SGS Audited Supplier

Direct Manufacturer. 20 Years of Experience. Exported to 40+ Countries. Zero Structural Failures.

metal workshop building
steel frame workshop
prefab workshop buildings

Real Challenges, Real Solutions (Case):

Featured Project: The Hurricane-Proof Workshop in the Philippines.

The Challenge: The client is located in a typhoon zone (Wind speed > 180km/h).

Our Solution: We increased the column cross-section and added secondary wind-resistant columns. Used specialized anti-corrosion paint for the humid climate.

The Result: The Workshop remained intact during Typhoon Haiyan.


We Are Not Afraid To Show It: Total Quality Transparency.

Welding Quality: "100% Ultrtrasonic Testing (UT) of all butt welds to guarantee no internal defects."

Test Before You Take The Risk: "SGS/BV - 3rd party you hire to inspect your goods before we load the container. We are open to it."

metal workshop building
steel frame workshop
prefab workshop buildings
metal workshop building
steel frame workshop
prefab workshop buildings

Steel Structure Workshop Buyer's Guide:

Cost Breakdown: "What are the actual expenses? (Steel vs. Labor vs. Logistics)"

• Main steel structure (approximately 55-60%).

• Cladding system (approximately 15-20%).

• Accessories and doors/windows (approximately 10%).

• Logistics and packaging (approximately 10-15%).

• Engineering and design (included): Competitors typically charge for detailed drawings. We include this cost in our manufacturing costs.


Frame Types: "Clear Span vs. Multi Span - Which one suits you better?"

What Structural Layout Works Best With Your Business ‍‌Workflow?

Never select a frame just because it looks good; instead, select it based on how it works.


Option A: Clear Span (The "Flexible Giant").

What is it? A layout without any columns inside. The area is completely open.

Best For: Airplane hangars, sports centers, or manufacturing lines where large machinery is required to move freely.

Cost Reality: A bit more. As there are no supports inside, the outer columns and beams have to be thicker (more steel usage) to carry the roof load.


Work around with this one if you can't live without flexibility.


Option B: Multi Span (The "Budget Saver").

What is it? A structure with one or more rows of columns inside.

Best For: Distribution centers, raw material storage, or production plants where forklifts can easily maneuver around columns.

Cost Reality: Greatest Savings. The addition of an internal column shortens the span, thus allowing lighter H-beams to be used. Total steel weight can thus be reduced by 15-20% approximately.

Verdict: If your operational flow is column-friendly, then this is the most effective way of cutting down your ‍‌budget.

metal workshop building
steel frame workshop
prefab workshop buildings

Installation: "Bolt Connection vs. Site Welding - Why we prefer 100% Bolted."

Here is why our 100% Bolted Connection system is the global standard:

Speed (Time is Money):

Welding: Requires skilled (expensive) welders and takes weeks.

Boulonnage : N'importe quel ouvrier non qualifié muni d'une clé peut effectuer cette opération. Toutes nos pièces sont pré-percées avec une précision CNC. Il suffit donc à votre équipe d'aligner les trous et de serrer les boulons. Installation 30 % plus rapide.

Zéro erreur :

Le soudage sur chantier dépend de l'humeur de l'ouvrier. La préfabrication en usine est contrôlée par ordinateur. Si le trou pour le boulon correspond, la structure est correcte. Il n'y a pas lieu de faire de suppositions.

 

Astuce de pro : Le saviez-vous ? Vous pouvez réduire le poids total de votre acier de 15 % simplement en passant d’un espacement entre les travées de 6 m à 7,5 m. Découvrez comment avec nous.


Options d'enveloppe :

TaperMatérielÉpaisseurPerformanceUtilisation typique
Panneau à simple peauAcier revêtu de couleur de 0,3 à 0,8 mm (Baosteel/Shougang)0,3 mm-0,8 mmImperméable et résistant au vent, faible isolationentreposage temporaire
Sandwich en laine de rocheNoyau en laine de roche de 50 à 200 mm + parements en acier50 mm-200 mmClassement au feu A, λ ≤ 0,04 W/m·Kusines industrielles, entrepôts alimentaires/pharmaceutiques
Sandwich PURNoyau en polyuréthane de 50 à 150 mm + parements en acier50 mm-150 mmλ ≤ 0,024 W/m·K, étanchéité supérieureEntrepôts frigorifiques, ateliers de précision
metal workshop building
steel frame workshop
prefab workshop buildings

Arrêtez de deviner. Commencez à construire avec des experts.

Votre projet a besoin d'une étude technique, pas d'un simple devis. Téléchargez votre croquis et nos ingénieurs vous feront parvenir une première ébauche du plan en moins de 24 heures.


Envoyez-nous vos dessins, et la prochaine étape sera : l’examen de la proposition par un ingénieur.


metal workshop building

steel frame workshop

Produits connexes

Obtenir le dernier prix ? Nous vous répondrons dans les plus brefs délais (sous 12 heures)